Major Enhancements set for Student Union

Student Union

Share this

Originally Posted on Buffalo.edu
Read original article

The Student Union, a vibrant hub of the North Campus, is preparing to get its first major renovation in more than 30 years.

The campus project, set to begin at the end of December, will focus on the stairs and lobby of the Student Union. The goal is to create a more student-friendly experience that gives the feel of a “living room” and enhances the social heart of the North Campus by providing a variety of flexible seating and workspaces for students.

The goal of the renovation is to create a more student-friendly experience that gives the feel of a “living room” and enhances the social heart of the North Campus by providing a variety of flexible seating and workspaces for students.

“We are excited to launch phase one of a two-phase construction project later this month that will bring a new sense of excitement and enhanced amenities to our Student Union,” says Brian Hamluk, vice president for student life.

Students travelling through the union this week were met with the installation of temporary walls in preparation for phase one of construction, which will begin Dec. 20. The entire project will last about a year.

The temporary walls will allow for construction to continue while the union remains open and occupied for food, activities and student services.

The project includes removal of the interior vestibule wall; a variety of new seating for students to meet, eat or study; and better access between the second and third floors with the addition of a new, open staircase.

Related Articles

Adaptive Reuse by Architectural Resources

Adaptive Reuse

In architectural theory and design practice, buildings are treated as static objects. A design may propose spaces, finishes, and adjacencies that respond to one potential path for a building’s use.

Urban Design

Urban Design

Parks are the place! The great role of parks and public spaces in advancing health, wellness and inclusion in our communities has become even more vital today.

January 2021 Virtual Reality

2021: Our virtual reality

It’s 2021! We’ve finally made it.
We’ve spent nearly a year working remotely, at full steam, supporting our clients with design solutions that are more critical than ever to navigate their workspace, shape the healthcare environment and reinvent (again) what the classroom can and should provide.

Valentine’s Heart-Bomb

Here’s to our annual tradition of heart bombing one of our beloved buildings! Check out our vision for this building.

March Music at Architectural Resources

Performance Space Design

March is Music in Our Schools Month, and this March we celebrate the performing arts and spaces that support the inclusive and energizing experience of live performance.

find

Buffalo Office
505 Franklin Street Buffalo, NY 14202

NewYork Office
303 West 13th Street New York, NY 10014

Connect